Resourcing tools
Resourcing lets an assistant read the resourcing schedule and change the plan. It can answer “who has time for the Harbour St design in November?”, and then add, move, resize or remove allocations, move deliverable, task and milestone dates, or push a whole project, after you have seen the effect. It can also undo a list of changes it saved.
The toolset also has search_records, delete_record with kind allocation, list_projects and get_project, and the report tools. An account admin gets 10 tools.
The same operations run the web resourcing screens and the REST endpoints GET /api/v1/resource_schedule and /api/v1/resourcing_changes, so a change is refused or saved for the same reasons everywhere.
Renamed tools.
preview_resourcing_changesandapply_resourcing_changesreplacedpreview_allocation_changesandapply_allocation_changeson 2026-10-19. The old names still run for one release, but the server no longer lists them. Move any saved prompts or scripts to the new names.
Who gets the toolset
Drum offers Resourcing to a user who can read some resourcing schedule:
- The account schedule, with the “view global resourcing” permission.
- A project’s schedule, through a resourcing permission or a resourcing project role on that project.
Each change then needs:
- The API permission of its effect:
api_createfor acreate,api_deletefor adelete, andapi_updatefor the other types. Anundoneeds the permissions of what it does: undoing a create needsapi_delete, and undoing a delete needsapi_create. - The resourcing edit right on its own project. A milestone date also needs the right to update the milestone.
A change on a project the user cannot read or resource answers not_found, as if the record did not exist.
How the tools fit together
- Read.
get_resource_schedulereturns each person’s weekly figures and the allocations behind their load. Each allocation has aplan_revision. For date changes,get_projectwithresponse_formatdetailedreturns each deliverable’s and task’supdated_at, and each milestone’s. - Preview.
preview_resourcing_changesruns a list of changes and saves nothing. It answers asummary,totals, the first page of thechanges(eachokor its error), apreview_idand apreview_token. - Show the user. The assistant should show the summary and any warnings, and ask before it saves. It can read more of the impact by
preview_id(see Preview pages). - Apply.
apply_resourcing_changestakes the same list, thepreview_tokenand a newidempotency_key. It saves every change or none, and answers achange_set_id. - Undo, if needed. A list with one
undochange and thatchange_set_idrestores what the list changed.
To remove one allocation on its own, the assistant can also call delete_record with kind allocation. An allocation with past weeks, or hours already logged this week, keeps them as history and loses the rest of its plan. The result then has permanent false and the warning past_weeks_kept. A deleted allocation cannot be restored with restore_record.
The figures
All figures are whole minutes. Each per-week array follows the order of weeks.
| Field | Meaning |
|---|---|
capacity_minutes |
The billable target hours of the person’s work schedule that week. A person with no work schedule has 38 hours |
unavailable_minutes |
Public holidays of the person’s region, plus leave on other days, at most the standard week |
load_minutes |
For each project, the larger of planned minutes (tentative and confirmed allocations) and tracked minutes, summed |
other_work_minutes |
The part of the load on projects the user cannot read, and personal rows |
free_minutes |
Capacity less unavailable time (not below 0), less load. Negative means over-allocated |
over_allocated_weeks |
The number of weeks with negative free minutes |
A schedule covers at most 26 weeks, and people come in pages of up to 50.
Changes
A list holds 1 to 50 changes, run in order. A later change sees what an earlier one did. A change takes only the inputs of its type, and null counts as not sent, except on set_task_dates, where it clears the date.
type |
Does | Main inputs |
|---|---|---|
create |
Adds a weekly allocation on a deliverable or a task | deliverable_id or task_id, member_id and/or resource_type_id, start_week, end_week or num_weeks, minutes_per_week and/or total_minutes, optional ref |
update |
Changes the person, role, status, tie or distribution, resizes the span, or sets a new plan | allocation_id or allocation_ref, expected_plan_revision, and the fields to change |
shift |
Moves an allocation by whole weeks, or hands its current and future weeks to another person | allocation_id or allocation_ref, expected_plan_revision, weeks (negative for earlier), optional member_id |
set_week |
Sets the minutes of one week | allocation_id or allocation_ref, expected_plan_revision, week, minutes |
delete |
Removes an allocation | allocation_id or allocation_ref, expected_plan_revision |
set_deliverable_dates |
Moves a deliverable’s start or end date | deliverable_id, expected_updated_at, start_date and/or end_date, optional move |
push_project |
Moves a project’s dates from a day on, by whole weeks | project_id, from_date, weeks (-52 to 52, not 0), optional deliverable_ids, task_ids, move |
set_task_dates |
Sets or clears a task’s start and due dates | task_id, expected_updated_at, start_date and/or due_date |
set_milestone_date |
Moves a milestone’s planned date | milestone_id, expected_updated_at, planned_date, optional note |
undo |
Restores what an applied list changed. It must be the only change of its list | change_set_id |
Rules:
- Weeks and dates are
yyyy-mm-dd. A week starts on Monday, and “this week” is the account’s week in its time zone. - No change can write a week before this week or move a date before today. A resize may send the allocation’s current start unchanged, and its past weeks stay as they are.
refnames a new allocation, and a later change in the same list uses it asallocation_ref.- A role with no person (
resource_type_idalone) is an unfilled role. A task allocation needs a person. - A person has one allocation on a deliverable, whatever its role, and one on a task. A second answers
allocation_existswith the id of the first: update that one instead. total_minutesis spread over the weeks fromstart_week, withdistributioneven,front_loadedorback_loaded, and must fitminutes_per_weekin each week.- A plan covers at most 520 weeks, and one list writes at most 1,040 weeks.
set_weekwithminutes0 clears a week, but not the last one (last_week_of_allocation). Delete the allocation instead.- Timed allocations are read only. They are listed by the schedule, but no change or delete reaches them.
Handing work to another person
A shift with member_id hands the current and future weeks of a task or deliverable allocation to another person in one step. weeks: 0 is allowed with it. Past weeks, and hours already logged this week, stay with the original person, and the result names the new allocation for the moved work. The new person may not already have an allocation on the task or deliverable (allocation_exists). It needs api_create as well as api_update, because it can create that allocation.
On a task, the moved work books against the new person’s resource line of the role. When the allocation has no past weeks and no hours logged this week, and its resource line has no logged time and no other allocation, the line itself moves to the new person, with its budget. The web resourcing screens do the same.
Moving dates
Tied allocations always move with their deliverable’s or project’s dates. move lists what else moves, and each flag is false by default:
move flag |
Moves |
|---|---|
other_allocations |
The allocations on the deliverable or project that are not tied |
task_dates |
The dates of the deliverable’s tasks (set_deliverable_dates only) |
milestones |
The milestones of the deliverable or project |
An achieved milestone keeps its date (milestone_achieved). Reopen it first.
Revisions
The first change on a record in a list needs its current revision. Later changes on the same record in the same list may leave it out.
- An allocation needs
expected_plan_revision, theplan_revisionthatget_resource_schedulereturned. - A deliverable, task or milestone needs
expected_updated_at, itsupdated_atfromget_project(to the microsecond).
If someone changed the record since, the call answers conflict with reason stale_state (with current_plan_revision for an allocation). Read it again, check it, and send the change with the new revision.
Budgets
A change that adds minutes past the budget of its deliverable or task is refused with over_budget, unless the user has “allow over budget resourcing” on the project. The cap is the web editor’s: the remaining budget in hours at the project’s rate for the role, or, for one week of a task priced by the hour, its budgeted hours. The error details have budget with kind (deliverable, task or resource_line), id and remaining_minutes.
In the budgets collection of a preview, each budget has money only when the user can see the project’s money.
Only a fixed fee deliverable and a client cap hold resourcing. Each budgets row has its deliverable’s limit_kind: fixed_fee, client_cap, estimate or open. Planning past an hourly estimate is allowed for anyone who may edit resourcing: it sets past_estimate_after and adds the past_estimate warning (“The estimate of NAME is passed after these changes”), and is never over_budget. Open hourly work has no amount to pass. Before 10 November 2026 every budget held resourcing.
Tied allocations
A tied allocation stays within its deliverable’s dates. A change that would move it outside them answers conflict with reason boundary_resolution_required and the deliverable’s dates. Send the change again with boundary:
extendmoves the deliverable’s dates to fit. On ashift,set_weekorupdate, it also grows the deliverable’s other tied allocations that reached its old dates, asset_deliverable_datesdoes. An allocation with a manual distribution stays where it is. The grown allocations are in the result, and anundorestores them.detachunties the allocation.
A change sent with boundary: "extend" locks more rows than the same change without it, so send extend only in answer to boundary_resolution_required.
Preview pages
A preview is stored for 30 minutes, or until the next Monday in the account’s time zone if that is sooner. Its first answer has the first page of changes, with:
| Field | Meaning |
|---|---|
summary |
One line for the user, for example “2 changes, no one is over capacity in the changed weeks” |
totals |
Counts over the whole list: changes and failed changes, people and weeks over capacity, dates moved, budgets over, warnings and more |
can_apply |
true when every change succeeded and the user has every permission the list needs |
capabilities, missing_capabilities |
The API permissions the list needs, and those the user lacks |
preview_id |
Reads more pages of this preview |
preview_token |
Binds the apply to this preview. It is given once, in the first answer |
expires_at |
When the stored preview expires |
To read more, call preview_resourcing_changes again with preview_id instead of changes, and collection, cursor (the next_cursor of the page before) and limit (1 to 200, default 50). A page holds at most 32,000 bytes, so it can hold fewer rows than limit.
collection |
Rows |
|---|---|
changes |
Each change: ok or its error, and what it did |
edits |
Each allocation created, deleted or changed, date ripples included, before and after |
blocks |
Each current or future week of those allocations whose minutes change, before and after |
members, member_weeks |
The people whose planned time changes, and their weeks: capacity, minutes before and after, free minutes after, over capacity |
dates |
Each deliverable, task and milestone date that moves, before and after |
demand |
The unfilled role demand that changes |
budgets |
The deliverable and task budgets the list draws on |
warnings |
What the user should know before saving |
A page shows what was proposed when the preview ran, not the plan now. A preview of another user, or one with a record the user can no longer read, answers not_found with reason preview_not_found.
Apply and undo
apply_resourcing_changes needs an idempotency_key: a new key for each list. After a timeout, the assistant sends the same key and the same changes again, and gets the first answer with replayed true. Nothing is saved twice. The same key with other changes answers idempotency_key_reused.
With the preview_token, the apply refuses changes that are not the preview’s (preview_mismatch), a preview that expired (preview_expired) or had an error (preview_not_applicable), and records that changed since the preview (preview_stale). On preview_stale, the assistant should preview again and show you the new result. preview_bound in the answer says whether a token was sent.
The answer has the summary, the totals and a short receipt for each change. A date change gives date_counts (deliverables, tasks, milestones and allocations moved), not every date: the full before and after dates stay in the preview’s dates collection until it expires.
change_set_id is the input of an undo. An undo removes the allocations the list created, restores the ones it changed and the dates it moved, and makes again the ones it deleted, with new ids (the receipt maps old ids to new). The author of the list, or an account admin, can undo it within 30 days, while nothing it changed has changed again and nothing it would restore is in the past.
Errors
code |
reason |
When |
|---|---|---|
not_found |
allocation_not_found, deliverable_not_found, task_not_found, milestone_not_found, member_not_found, resource_type_not_found, project_not_found, change_set_not_found |
The record is not on a project the user can read or resource. A timed allocation is not found either |
not_found |
preview_not_found |
The preview is unknown, another user’s, or has a record the user can no longer read |
not_authorized |
resourcing_not_permitted |
The user may not read this schedule |
not_authorized |
resourcing_edit_not_permitted |
The user may not edit the resourcing of the project |
not_authorized |
permission_missing |
The user’s role lacks the API permission of a change (capability). Do not retry |
conflict |
stale_state |
The record changed since it was read |
conflict |
allocation_exists |
The person already has an allocation on the deliverable or task |
conflict |
boundary_resolution_required |
A tied allocation would leave its deliverable’s dates |
conflict |
blocked_dependency |
The change depends on an earlier change that failed, or that deleted its allocation (depends_on) |
conflict |
resourcing_busy |
Another save held the same rows. Nothing was saved. Try again |
conflict |
preview_expired, preview_mismatch, preview_not_applicable, preview_stale |
The apply does not match a usable preview (see Apply and undo) |
conflict |
idempotency_key_reused |
The key was used for other changes. Send a new key |
conflict |
undo_stale, already_undone |
A record changed after the list was applied, or the list is already undone |
invalid |
undo_expired, undo_past_boundary, undo_not_supported |
The list is more than 30 days old, the undo would change the past, or the list was applied before undo existed |
invalid |
milestone_achieved |
An achieved milestone keeps its planned date |
invalid |
too_many_changes, too_many_records, too_many_blocks, invalid_input, missing_input, past_week, date_in_past, date_range_inverted, date_range_too_long, too_many_weeks, total_does_not_fit, last_week_of_allocation, over_budget, preview_too_large, validation_failed |
The list or a change is malformed, too large, or breaks a rule above |
In a preview, a failed change has ok false and its error, and the other changes still run, so the assistant can fix every problem at once. In an apply, the first failed change rolls back the whole list, and the error names it with change_index and its field as changes[i].field.
Tools
Each tool below shows what the server sends: its description (written for the AI), its kind, the permissions it needs, the fields it returns, and its inputs. An input in a.b or a[].b form is a field inside an object or a list. For the shared rules on results, pages, money and errors, see Results, errors and limits.
get_resource_schedule
Read weekly capacity, unavailable time, load and free minutes, with allocations and their plan_revision. Load sums each project’s larger planned or tracked amount, negative free minutes mean over-allocation, and other_work_minutes aggregates hidden work. With project_id, scope schedule lists allocated people, while scope staffing_candidates finds every eligible member and hides all other projects. exclude_project_ids leaves those projects’ load out, while min_free_minutes and sort most_free use free_basis, a weekly estimate rather than a time slot. People use offset and roles use unfilled_roles_offset. When unfilled_roles_has_more is true, add the returned role count to unfilled_roles_offset for the next role page.
| Title | Get resource schedule |
| Toolsets | Resourcing |
| Kind | Read only, Idempotent |
| Needs | api_read, and “view global resourcing”. With project_id, resourcing access to that project instead (a resourcing permission or a resourcing project role) |
| Returns | scope, start_week, end_week, weeks, project_id, availability, members, unfilled_roles, unfilled_roles_has_more, unfilled_roles_offset, count, limit, offset, has_more |
| Input | Type | Required | Description |
|---|---|---|---|
scope |
string | schedule (default) or staffing_candidates, which needs project_id and permission to change its resourcing. One of schedule, staffing_candidates. |
|
start_week |
string | First week, yyyy-mm-dd (any day of the week). Default this week. | |
end_week |
string | Last week, yyyy-mm-dd. Default 8 weeks from start_week. At most 26 weeks. | |
member_ids |
array of integers | Only these people. Ids from search_records with kinds member. | |
team_ids |
array of integers | Only the people of these teams. Ids from search_records with kinds team. | |
resource_type_ids |
array of integers | Only the people with these roles. Ids from search_records with kinds resource_type. | |
project_id |
integer | With scope schedule, only the people allocated to this project. With staffing_candidates, the project to staff. From search_records or list_projects. | |
exclude_project_ids |
array of integers | Leave the load of these projects out, to see the effect of stopping them. | |
only_over_allocated |
boolean | true for only the people over capacity in a week. Default false. | |
min_free_minutes |
integer | Only the people with at least this many free minutes on free_basis. | |
free_basis |
string | each_week (default): the least free week of the range. total: the free minutes of the whole range. One of each_week, total. |
|
sort |
string | name (default) or most_free, the most free minutes on free_basis first. One of name, most_free. |
|
limit |
integer | Maximum people to return. Default 10, maximum 50. | |
offset |
integer | Number of people to skip. Default 0. | |
unfilled_roles_offset |
integer | Number of unfilled roles to skip, independently of people. Default 0; at most 50 per page. |
preview_resourcing_changes
Show what a list of resourcing changes would do, without saving it: weekly allocations, deletes, deliverable, task and milestone dates, new milestones, project dates and pushes, or an undo. Each change answers ok or its error, and the summary, totals and pages of the impact collections give the effect. Send changes to simulate them, or preview_id with collection and cursor to read another page, never both. The first page lists up to 5 warnings and over-budget budgets, and the warnings and budgets collections hold the rest. Show the summary, the warnings and the budgets over to the user, then send the same changes and the preview_token to apply_resourcing_changes. Free minutes are weekly estimates, not free time slots.
| Title | Preview resourcing changes |
| Toolsets | Resourcing |
| Kind | Read only, Idempotent |
| Needs | api_read, and access to some resourcing schedule. Each change checks the resourcing edit right of its project |
| Returns | preview, ok, preview_id, preview_token, expires_at, can_apply, change_set_id, replayed, preview_bound, summary, totals, capabilities, missing_capabilities, collection, items, total, next_cursor, changes, warnings, over_budget |
| Input | Type | Required | Description |
|---|---|---|---|
changes |
array of objects | 1 to 50 changes, run in order. A later change sees what the earlier ones did. | |
changes[].type |
string | Yes | create, update, shift, set_week (weekly allocations), delete (an allocation), set_deliverable_dates, push_project, set_task_dates, set_milestone_date, set_project_dates, create_milestone, or undo (alone). Null omits an input except task dates, where it clears. One of create, update, shift, set_week, delete, set_deliverable_dates, push_project, set_task_dates, set_milestone_date, set_project_dates, create_milestone, undo. |
changes[].ref |
string or null | create: name for a later allocation_ref. | |
changes[].allocation_ref |
string or null | update, shift, set_week, delete: earlier create’s ref. | |
changes[].allocation_id |
integer or null | update, shift, set_week, delete: get_resource_schedule. | |
changes[].expected_plan_revision |
integer or null | update, shift, set_week, delete: get_resource_schedule; required on each allocation’s first change in the list. | |
changes[].deliverable_id |
integer or null | create (not task_id), set_deliverable_dates, create_milestone: get_project. | |
changes[].task_id |
integer or null | create (not deliverable_id), set_task_dates: get_project. | |
changes[].split_from_allocation_id |
integer or null | task create: get_resource_schedule; source booking on the same task, preserves its catch-up credit. | |
changes[].member_id |
integer or null | create, update, shift: search_records kind member; shift keeps past work with original person, needs api_create too. | |
changes[].resource_type_id |
integer or null | create, update: search_records kind resource_type. Alone: unfilled role. | |
changes[].start_week |
string or null | create, update: first week, yyyy-mm-dd, not before this week. | |
changes[].end_week |
string or null | create, update: last week, yyyy-mm-dd. | |
changes[].num_weeks |
integer or null | create, update with total_minutes: instead of end_week. | |
changes[].minutes_per_week |
integer or null | create, update: minutes each week. | |
changes[].total_minutes |
integer or null | create, update: minutes spread from start_week. | |
changes[].distribution |
string or null | create, update: total_minutes spread; task rows: tied only. One of even, front_loaded, back_loaded. |
|
changes[].status |
string or null | create (default tentative), update. One of tentative, confirmed. |
|
changes[].tied |
boolean or null | create, update: follow deliverable dates (task rows too, never task dates); task rows start untied. | |
changes[].boundary |
string or null | update, shift, set_week past tied dates: extend dates (also grows other tied rows, not manual ones) or detach. Send only after boundary_resolution_required. One of extend, detach. |
|
changes[].weeks |
integer or null | shift (-520..520), push_project (-52..52): nonzero except shift with member_id; negative moves earlier. | |
changes[].week |
string or null | set_week: yyyy-mm-dd. | |
changes[].minutes |
integer or null | set_week: 0 clears week; last week needs delete. | |
changes[].project_id |
integer or null | push_project, set_project_dates, create_milestone: search_records or list_projects. | |
changes[].from_date |
string or null | push_project: move dates on/after this yyyy-mm-dd. | |
changes[].deliverable_ids |
array or null | push_project: only these deliverables, from get_project. | |
changes[].task_ids |
array or null | push_project: only these tasks, from get_project. | |
changes[].move |
object or null | set_deliverable_dates, push_project: ripple flags, default false; tied allocations always follow. | |
changes[].expected_updated_at |
string or null | set_deliverable_dates, set_task_dates, set_milestone_date: get_project; required on each record’s first change in the list. | |
changes[].start_date |
string or null | set_deliverable_dates, set_task_dates, set_project_dates: yyyy-mm-dd; null clears task date. | |
changes[].end_date |
string or null | set_deliverable_dates, set_project_dates: yyyy-mm-dd. | |
changes[].due_date |
string or null | set_task_dates: yyyy-mm-dd; null clears. | |
changes[].milestone_id |
integer or null | set_milestone_date: get_project. | |
changes[].planned_date |
string or null | set_milestone_date, create_milestone: yyyy-mm-dd. | |
changes[].name |
string or null | create_milestone. | |
changes[].milestone_type_id |
integer or null | create_milestone: get_project milestone_types. | |
changes[].note |
string or null | set_milestone_date: reason. create_milestone: note. | |
changes[].change_set_id |
integer or null | undo: apply_resourcing_changes result. | |
exclude_project_ids |
array of integers | With changes: leave the load of these projects out, to see the effect of stopping them. | |
preview_id |
string | Read a stored preview from an earlier call, instead of changes. | |
collection |
string | With preview_id: the collection. Default changes. One of changes, edits, blocks, members, member_weeks, dates, demand, budgets, warnings. |
|
cursor |
string | With preview_id: next_cursor of the page before. | |
limit |
integer | With preview_id: rows on the page, 1 to 200. Default 50. |
apply_resourcing_changes
Save the user’s reviewed resourcing changes, all or none, with the same changes and preview_token from preview_resourcing_changes. On preview_stale, preview again and show the user before applying. Use a new idempotency_key per list. After a timeout, retry identical inputs for the first receipt with replayed true and no new writes. Use change_set_id in one undo change to undo the list. Errors name change_index and date receipts give date_counts, with full proposed dates in the preview’s dates collection.
| Title | Apply resourcing changes |
| Toolsets | Resourcing |
| Kind | Writes data, Destructive, Idempotent |
| Needs | api_create, api_update or api_delete, and access to some resourcing schedule. Each change needs the API permission of its effect (a delete needs api_delete; an undo needs the permissions of what it undoes) and the resourcing edit right of its project. A milestone date also needs the milestone update right |
| Returns | preview, ok, preview_id, preview_token, expires_at, can_apply, change_set_id, replayed, preview_bound, summary, totals, capabilities, missing_capabilities, collection, items, total, next_cursor, changes, warnings, over_budget |
| Input | Type | Required | Description |
|---|---|---|---|
changes |
array of objects | Yes | 1 to 50 changes, run in order. A later change sees what the earlier ones did. |
changes[].type |
string | Yes | create, update, shift, set_week (weekly allocations), delete (an allocation), set_deliverable_dates, push_project, set_task_dates, set_milestone_date, set_project_dates, create_milestone, or undo (alone). Null omits an input except task dates, where it clears. One of create, update, shift, set_week, delete, set_deliverable_dates, push_project, set_task_dates, set_milestone_date, set_project_dates, create_milestone, undo. |
changes[].ref |
string or null | create: name for a later allocation_ref. | |
changes[].allocation_ref |
string or null | update, shift, set_week, delete: earlier create’s ref. | |
changes[].allocation_id |
integer or null | update, shift, set_week, delete: get_resource_schedule. | |
changes[].expected_plan_revision |
integer or null | update, shift, set_week, delete: get_resource_schedule; required on each allocation’s first change in the list. | |
changes[].deliverable_id |
integer or null | create (not task_id), set_deliverable_dates, create_milestone: get_project. | |
changes[].task_id |
integer or null | create (not deliverable_id), set_task_dates: get_project. | |
changes[].split_from_allocation_id |
integer or null | task create: get_resource_schedule; source booking on the same task, preserves its catch-up credit. | |
changes[].member_id |
integer or null | create, update, shift: search_records kind member; shift keeps past work with original person, needs api_create too. | |
changes[].resource_type_id |
integer or null | create, update: search_records kind resource_type. Alone: unfilled role. | |
changes[].start_week |
string or null | create, update: first week, yyyy-mm-dd, not before this week. | |
changes[].end_week |
string or null | create, update: last week, yyyy-mm-dd. | |
changes[].num_weeks |
integer or null | create, update with total_minutes: instead of end_week. | |
changes[].minutes_per_week |
integer or null | create, update: minutes each week. | |
changes[].total_minutes |
integer or null | create, update: minutes spread from start_week. | |
changes[].distribution |
string or null | create, update: total_minutes spread; task rows: tied only. One of even, front_loaded, back_loaded. |
|
changes[].status |
string or null | create (default tentative), update. One of tentative, confirmed. |
|
changes[].tied |
boolean or null | create, update: follow deliverable dates (task rows too, never task dates); task rows start untied. | |
changes[].boundary |
string or null | update, shift, set_week past tied dates: extend dates (also grows other tied rows, not manual ones) or detach. Send only after boundary_resolution_required. One of extend, detach. |
|
changes[].weeks |
integer or null | shift (-520..520), push_project (-52..52): nonzero except shift with member_id; negative moves earlier. | |
changes[].week |
string or null | set_week: yyyy-mm-dd. | |
changes[].minutes |
integer or null | set_week: 0 clears week; last week needs delete. | |
changes[].project_id |
integer or null | push_project, set_project_dates, create_milestone: search_records or list_projects. | |
changes[].from_date |
string or null | push_project: move dates on/after this yyyy-mm-dd. | |
changes[].deliverable_ids |
array or null | push_project: only these deliverables, from get_project. | |
changes[].task_ids |
array or null | push_project: only these tasks, from get_project. | |
changes[].move |
object or null | set_deliverable_dates, push_project: ripple flags, default false; tied allocations always follow. | |
changes[].expected_updated_at |
string or null | set_deliverable_dates, set_task_dates, set_milestone_date: get_project; required on each record’s first change in the list. | |
changes[].start_date |
string or null | set_deliverable_dates, set_task_dates, set_project_dates: yyyy-mm-dd; null clears task date. | |
changes[].end_date |
string or null | set_deliverable_dates, set_project_dates: yyyy-mm-dd. | |
changes[].due_date |
string or null | set_task_dates: yyyy-mm-dd; null clears. | |
changes[].milestone_id |
integer or null | set_milestone_date: get_project. | |
changes[].planned_date |
string or null | set_milestone_date, create_milestone: yyyy-mm-dd. | |
changes[].name |
string or null | create_milestone. | |
changes[].milestone_type_id |
integer or null | create_milestone: get_project milestone_types. | |
changes[].note |
string or null | set_milestone_date: reason. create_milestone: note. | |
changes[].change_set_id |
integer or null | undo: apply_resourcing_changes result. | |
preview_token |
string | From the preview_resourcing_changes call that showed these changes. | |
idempotency_key |
string | Yes | A new key for each list, 255 characters or fewer. The same key on a retry. |