How to plan resourcing with an assistant
With the Resourcing toolset, an assistant can read the resourcing schedule, plan people’s weekly allocations, and move deliverable, task, milestone and project dates for you. It previews every change and shows you the effect on people’s free time, dates and budgets before it saves anything, and it can undo what it saved. The rules are the same as in the Drum resourcing screens.
Before you begin
- Connect an assistant with Resourcing selected. See Choose toolsets. Drum offers the toolset only when you can read a resourcing schedule: the account schedule (“view global resourcing”), or a project’s through a resourcing permission or project role.
- To make changes, you need the resourcing edit right on each project, and the API permission of each change:
api_createto add an allocation,api_updateto change one or move dates, andapi_deleteto remove one. Moving a milestone also needs the right to update it.
Find who has time
Ask about a range of weeks, and narrow it by person, team, role or project if you like.
Who has at least two days free each week from 3 November to 28 November?
Which designers have capacity in December?
The assistant reads each person’s capacity, leave and holidays, and load for each week, and works out their free time. Free time is capacity less unavailable time, less load. A schedule covers at most 26 weeks.
Work on projects you cannot see still counts toward a person’s load. It is shown as other work, without the project.
Find over-allocated people
Is anyone over-allocated in the next six weeks? Who, and on which projects?
The assistant lists only the people with a week of negative free time, and the allocations behind their load.
See who is on a project
Who is working on Harbour St in the next two months, and which roles still need someone?
With a project, the assistant lists the people allocated to it and its unfilled roles: allocations with a role but no person.
Ask “what if”
What happens to the team’s load if the Northside job stops?
The assistant reads the schedule with that project’s load left out. Nothing changes in Drum.
Change allocations
Say what should change. You can ask for several changes at once.
Push Sam’s design work on Harbour St back two weeks.
Put a senior engineer on the drainage design for 60 hours over the next four weeks, front loaded, tentative.
Set Alex to 10 hours in the week of 17 November on Riverside, and confirm the allocation.
The assistant:
- Reads the schedule to find the allocations and their current revision.
- Previews the changes. Nothing is saved.
- Shows you the effect: the people and weeks that change, their free time after the change, anyone over capacity, the dates that move, the budgets the changes draw on, and any warnings.
- Asks before it saves. Say yes, or ask for a different plan.
- Saves exactly the changes you saw. Every change is saved, or none. If something changed in Drum since the preview, it previews again and shows you the new effect first.
A change cannot write a week before this week or move a date into the past, and past weeks stay as they are.
Move dates
Ask to move a deliverable, a task or a milestone, or to push a whole project.
Move the Harbour St design deliverable to finish on 27 November, and take its tasks and milestones with it.
The client delayed Riverside. Push everything from next Monday back three weeks.
Set the due date of the drainage calcs task to 6 November.
Move the stage 2 review milestone to 13 November. The client moved the meeting.
Allocations tied to a deliverable always move with its dates. Say whether the other allocations, the tasks’ dates and the milestones should move too: by default they stay where they are. An achieved milestone keeps its date.
The assistant previews a date change like any other, and the preview lists every date that moves.
When a change is refused
| The assistant says | What to do |
|---|---|
| The person already has an allocation on that deliverable or task | Ask it to change the existing allocation instead |
| The change would take the budget over | Lower the hours, or ask someone with “allow over budget resourcing” on the project to make the change |
| The allocation would leave its deliverable’s dates | Choose: move the deliverable’s dates to fit, or untie the allocation from them |
| Someone else changed the allocation or the date | Ask it to read the schedule or the project again and redo the change |
| The milestone is achieved | Reopen the milestone in Drum first, or leave its date |
| Your role does not permit that kind of change | Ask an admin for the API permission, or for someone else to make it |
| You cannot edit the resourcing of the project | Ask a project lead or an admin |
| Another save was running | Ask it to try again |
Remove an allocation
Remove Alex’s allocation on the Riverside fit-out.
The assistant should confirm before it removes it. It can remove allocations in the same list as other changes, so a swap of one person for another is saved as one change. An allocation with past weeks keeps them as history and loses only its current and future weeks. An allocation removed with the other changes can come back with an undo, as a new allocation with a new id.
To clear one week but keep the allocation, ask it to set that week to 0 hours. The last week of an allocation cannot be cleared this way: remove the allocation instead.
Undo a change
Undo the changes you just made.
The assistant can undo a list of changes it saved, removed allocations included. It previews the undo first. You can undo your own changes, and an account admin can undo anyone’s, within 30 days. An undo is refused when something it would restore has changed since, or is now in the past: then ask for a new change instead.